What's new

Timeframe for Cabinet?

Danilo

"The Target"
Rating - 100%
116   0   0
Joined
Mar 17, 2009
Messages
3,099
What is the usual time frame from ordering to delivery of a Avallo 2000 (or 2000 cooled)
Thanks.
 

Danilo

"The Target"
Rating - 100%
116   0   0
Joined
Mar 17, 2009
Messages
3,099
also, forgot to ask...
What is the temp range of the cooled cabinets?
What controls it?

Thanks again.
 

Clint

Clint
Rating - 100%
206   0   1
Joined
Nov 10, 2006
Messages
7,192
Location
West Hills, CA
You should be asking Ron (RonC) these questions, as he is the Avallo rep for BOTLs.

My Avallo 2000 was kinda custom, as I opted for more slide out shelves instead of sigles shelves in order to store more boxes. This added to the overall time required to build. Ask Ron what the time frame is for your unit.

The Accumonitor system can be dialed in to your personal specs.

You will love your cabinet! These are the best on the market. I have had mine for 7 years now, with no issues to speak of.

Hope this helps....Post some pics when you get it :)
 

RonC

www.igloodor.com
Rating - 100%
106   0   0
Joined
Dec 13, 2004
Messages
4,331
Location
Tampa, FL
for a humidified cabinet, build time should be about 3-4 weeks, plus 1 week for shipping.

a cooled cabinet will add about a week.

The accumonitor controls the cooling units.
 

RonC

www.igloodor.com
Rating - 100%
106   0   0
Joined
Dec 13, 2004
Messages
4,331
Location
Tampa, FL
while capable of more, we like to tell customers that best performance is when cooling down 10 degrees or less from room temperature.
 

Danilo

"The Target"
Rating - 100%
116   0   0
Joined
Mar 17, 2009
Messages
3,099
But it is something I could set to where I'd like, or is it set at one point from factory?
 
Top