Hah yeah, I wasn't able to keep down all my breakfast before. We clearly did a job that should have been done in multi part stages in one night. Some of those servers way over 60lbs. Thats a lot of carting around when the boss is breathing down your neck cause he wants to beat rush hour traffic.You called in sick/sore?
I wish I had a camera to take a picture of the massive piles of cables were removed.